One page for the commercial conditions, so a buyer can check them without reading a specification sheet. If a tender or an internal purchase process needs a different structure, say so in the enquiry and we will answer in that format.
| Minimum order quantity | 1 unit. Sample orders welcome, quoted on the same terms as volume orders. |
|---|---|
| Lead time | 15–25 days for standard models after deposit is confirmed; 30–45 days for OEM/ODM configurations. |
| Payment terms | 30% T/T deposit on order confirmation; 70% balance cleared before shipment. No open account, no payment against copy of B/L. L/C at sight accepted, bank charges at buyer’s cost. |
| Incoterms | FOB Tianjin / Qingdao / Shanghai by default. CIF on request. LDP or DDP delivered terms available for the US and EU. |
| Shipping | Sea freight LCL or FCL; air freight on request for urgent spares. Export packing is wooden-crate for the cabinet and carton for accessories. |
| Documentation | Commercial invoice, packing list, bill of lading, certificate of origin on request, and the certificate set that ships with the unit (CE controller, H12 filter SDS, type-test report). |
| Warranty | 2-year standard warranty on the compressor, controller and filter module. Consumable filters are excluded. |
| After-sales | Remote installation guidance, video support, and filter replacement service. Spare parts are quoted at list price with no minimum order. |
What we need from you to quote
- Model, quantity, and destination country or port
- For the CJS-HP100B: room size, collection type and the RH set point you must hold
- Whether you need FOB, CIF or a delivered (LDP/DDP) price
- Any tender or procurement format the quotation has to follow
Send those four lines through the enquiry form and the reply comes back with a moisture-load calculation where it is relevant, not just a price.
Questions that come up in procurement
What are the payment terms?
30% T/T deposit on order confirmation; 70% balance cleared before shipment. No open account and no payment against copy of B/L. L/C at sight is accepted with bank charges at the buyer’s cost.
What is the minimum order quantity?
One unit. Sample orders are welcome and are quoted the same way as volume orders.
Which Incoterms do you quote?
FOB Tianjin, Qingdao or Shanghai by default. CIF on request, and LDP or DDP delivered terms for the US and EU.
What is the lead time?
15–25 days for standard models after deposit; 30–45 days for OEM/ODM configurations.
What warranty applies?
A 2-year standard warranty covering the compressor, controller and filter module, plus remote installation guidance and filter replacement service.
Need a quotation in a specific format?
Send the tender reference and the fields your process requires. We return the quote, the technical annex and the certificate list in the same structure.
Request a quotation →alex@syprointl.com · alex@syprointl.com · +86 177 1055 7225